|
Date
|
Client
|
Description
|
|
2007
|
Technip
|
Norne anchor replacement. EPC of temporary ROV deck. Marine operations analysis for replacement of Norne anchors.
|
|
2007
|
Statoil
|
Vigdis WI pipeline project: Design of tie-in structure, spools and transition piece.
|
|
2006/2007
|
Technip
|
Statoil IMR: Support of engineering services related to Tampen Link hot-tap operation
|
|
2006
|
BP
|
Valhall Flank, Detail design of PLEM and Tee design
|
|
2005
|
Gassco
|
Sleipner / Draupner Conceptual PLEM/Hot Tap design
|
|
2005
|
Statoil
|
Tampen Link, Detail design of 2 Tee’s in PLEM
|
|
2004
|
Statoil
|
Tyrihans – Pre-engineering of PLEM’s
|
|
2001
|
Norsk Hydro
|
Vidgis Tordis – Conceptual design for prevention of template settlement
|
|
2001
|
CSO
|
Esso Ringhorn – Verification of mid-water arches
|
|
2001
|
Stolt/Rockwater Joint Venture
|
PPCoN Ekofisk – Detailed Design of 2/4B Bypass spool
|
|
2001
|
Statoil
|
Svale Conceptual Design of Subsea structures
|
|
2001
|
Statoil
|
Snøhvit Conceptual Design of Subsea structures
|
|
1999 - 2000
|
Stolt-Rockwater Joint Venture
|
Gullfaks Phase II EPC of Subsea Protection Structure
|
|
1999 - 2000
|
Statoil
|
Norne / Heidrun Project Verification of Subsea Structures Design
|
|
1999 - 2000
|
Stolt-Rockwater Joint Venture
|
Gullfaks Phase II Design of subsea retro-fit hot-tap tee
|
|
1999
|
Statoil
|
Huldra Project Design of subsea hot-tap tee
|
|
1999
|
Statoil
|
Åsgard Flowlines Project Midgard and Flowlines Riser Bases
|
|
1999
|
Statoil
|
Åsgard Flowlines ProjectTee protection structures
|
|
1999
|
A/S Norske Shell
|
Draugen Gas Export Project Verification of subsea structures design
|
|
1997
|
Statoil
|
Åsgard Transport Project Concept design of Export Riser Base (ERB)
|