Norsk Hydro is the operator on this oil field which is to be tied to Troll C. The contract involves waxing, gel plugging, flooding and pressure testing of pipelines for oil production, water injection and gas lift. The contract also involves umbilical testing.
To be completed summer/fall 2006.