Being in the pipeline business since 1983, IKM Ocean Design has significant experience in the performing of conceptual through to detail design, having performed many such studies over the recent years.


Subsea Pipeline Projects

Year

Client

Description

2013

Statoil

Johan Sverdrup Infield Pipeline Concept Study

2013

Confidential

Hot-tap study into UK pipeline

2013

Statoil

Fogelberg Subsea Tie-back to Åsgard Study

2013

RWE

Zidane FEED SURF (Follow-on ongoing)

2013

Statoil

Gullfaksdalen Subsea Tie-back Concept Study / FEED

2012-2013

GE/INPEX

Ichtys Verical Jumper Detail Design (Australia)

2012

Statoil

Utsira High Power Hub – Cable Route Verification Study

2012

Technip

Alvheim Phase C – Subsea Tie inoperations detail design (spool and flange design)

2012

Statoil

Delta Phase 2 Pipelines Conceptual Study

2012

Statoil

Utsira High Oil Export pipeline concept study to Sture/Mongstad

2012-2014

Statoil

Peregrino Phase II SURF. Concept and FEED Study

2012

Det Norske

Draupne and Hanz pipelines FEED engineering

2012

EMAS

Troll A Power Cable detail Design

2012-

Statoil

Aasta Hansteen Flowlines FEED Engineering

2012

Statoil

Gullfaks South IOR Flowlines FEED Study

2011-2012

Aker/Total

Martin Linge (Hild) SURF BASIC Engineering

2011-

Statoil

Fram H-Nord Conceptual Pipeline, RFO & Subsea Engineering

2011-

Statoil

Smørbukk Sør Extension Conceptual Project

2011-

ENI/Aibel

Goliat CNG Studies Loading and Offloading arrangement

2011-

Statoil

Visund Nord Subsea Conceptual/FEED Study

2011-2012

Statoil

Vilje Sør Subsea Conceptual/FEED Study

2011-

Det Norske

Jetta. Seabed survey scope preparation and follow up

2011-

Confidential

Technical Due Diligence

2011-

Statoil

Valemon Pipelines Detail Design

2011-2014

ConocoPhillips

Ekofisk 2/4 V/B Subsea and Pipelines Detail Design

2010-

Statoil

Hyme Pipelines Conceptual/CONCEPT/FEED/Detail design Fast Track Project

2010

ConocoPhillips

B11 Bypass Study

2010

Total

David Subsea Conceptual Study

2010

Talisman

Blane Pig Launcher/Receiver Detail Design

2010

BG/Aibel

Bream Field Development – Subsea Conceptual Study

2010

ConocoPhillips

SSIV Preparedness Support

2010-

Statoil

Pan Pandora/Visund Sør Combined Conceptual and CONCEPT Study. Detail design ongoing. Fast track project

2010-

Statoil

Gjøa Operational Support of pipelines in operation

2010-

Technip

Smørbukk PIP Project. Detail Engineering

2009-

Technip /DONG

Oselvar PIP Design, Fabrication and Installation Verification/Certification Contract

2009-10

Total

Hild Subsea Conceptual Study

2009

Statoil

Trawl Assessment Screening Study

2009

StatoilHydro

Damage Assessment Kvitebjørn gas pipeline

2009

BP

HOD Flexible Pipeline Life Extension Project

2009

StatoilHydro

Haltenpipe Free Span Assessment

2009

StatoilHydro

Gjøa Cable CONCEPT Design & Engineering Services

2009

StatoilHydro

Kvitebjørn Oil Pipeline Study. Detailed gravel infill design related to free spans violating the free span criteria

2009

SDAG

Shtokman Pipeline Engineering Services (Flowlines)

2009

Lyse

Risavika LNG pipeline Detail design

2009

StatoilHydro

Kristin Q and K Project – CONCEPT Study

2009

Statoil

CO2 Transportation Network – CONCEPT

2009

StatoilHydro

Snorre Future Pipelines CONCEPT (inclusive reuse of risers)

2008-2009

Statoil

Skanled Pre-engineering

2005 – 2008

StatoilHydro

Tyrihans Detailed design. In cooperation with Rambøll and Nemo performing the detailed design of the 16”/18” production line, 10” gas inj. Line and umbilical and 3” MEG line.

2008

OLF

Preparation of Scope of Work for Development of National Standard on Life Extension for Transportation Systems (Norsok Y-002) (OLF).

2008

Statoil

Gas to Pierce Conceptual Study

2008

SF Gass

Sløvåg 8” Branch Pipeline, Detail Engineering

2008

StatoilHydro

Visund Conceptual Flowline Study

2008

Statoil

CO2 Transportation Network Conceptual Engineering

2008

StatoilHydro

Gudrun Conceptual Pipeline Study

2008

StatoilHydro

Snorre Future Pipeline Conceptual Study

2007-2008

ENI

Goliat Field Layout Verification Study

2007-2008

Statoil

Gjøa Pipelines Detail design. IKM responsible for the detail design activities for the 28” gas export pipeline as well as flowline tie-in, inplace analysis and seabed intervention design activities (in cooperation with Rambøll and Nemo)

2007

Altinex

Failure investigation of water injection line

2007-2008

Statoil

Kvitebjørn Oljerør Upgrade Study

2007

BP

Valhall Flank De-bottlenecking Costing study

2007-2008

Statoil

CO2 pipeline transportation conceptual engineering

2007

SF Gass

Detail Design of 8” branch line to Sløvåg

2007

Vetco

Kizomba: Stress analysis of 59 vertical tie-in spools/jumpers

2007-2008

BP

UTS/Gyda Crossing evaluation

2007

Talisman

Oselvar tie-in to Gyda study

2007

Statoil

Gjøa cable routing, installation and free span study

2007

Statoil

CO2 pipeline transportation feasibility study

2006/7

Statoil

Vigdis WI, Detailed design of 16” x 9km water injection pipeline. Residual curvature/ plastic lined pipeline

2006

Statoil

Åsgard Minimum Flow study.

2006

Statoil

Colette/Yttergryta CONCEPT.

2006

Total

Hild Field Development Study

2006

Statoil

Draugen D3 Subsea CONCEPT study involving the tie-back of the D3 well to either Draugen platform or the Garn West subsea manifold.

2006

BP

Ula – Statpipe gas pipeline Conceptual Study.

2006

Statoil

Vigdis Water Injection CONCEPT

2006

BP

Valhall Flank Detail design. Detailed design of 2 x 12” production flowlines and 2 x 8” gas injection pipelines.

2005/06

Statoil

Åsgard Subsea Project - Flowline J-101 Replacement

2005

BP

Valhall Flanke De-bottlenecking project

2005

BP

4” Hod gas failure assessment

2005

Statoil

Zeepipe IIA – Heimdal RP Crossover Pipeline Study

2005

GASSCO

Sleipner – Draupner Reinforcement Study

2005

Sarawak Statoil Berhad

Pre-Engineering of G7 and M3S flowlines

2005/06

Statoil

Tampen Link Detailed design of 10” riser, 32” gas pipeline and inline Tee











































































Subsea Structures

Year

Client

Description

2012-2014

Statoil

Peregrino Phase II SURF. Concept and FEED Study

2012-

Technip Norge

Detail design of Spools on Alvheim

2012

GE/Impex

Ichtys Verical Jumper Detail Design (Australia)

2011-2012

Aker/Total

Martin Linge (Hild) SURF CONCEPT Engineering.Subsea structures

2011

ConocoPhillips

Ekofisk 2/4 V/B Structures Detail Design including cut-out and inserting an inline Tee in existing 24” WI pipeline and two PLET structures, tie-ins spools where one is with future connection possibility, detail design of GRP protection covers.

2010

Statoil

Conceptual Design for the Gygrid Production and Gas Injection Riser Bases, PLET’s and Tie-in spools

2010

Talisman

Blane Pig Launcher/Receiver Detail Design (subsea and topside pig launchers)

2010

ConocoPhillips

Ekofisk II SSIV Intervention Tool – EPC Refurbishment Project

2010

Rogaland Gas Centre (RGC)

Conceptual study for 1.8 km long 4” CO2 pipeline from Skangass LNG plant to RGC test centre at Risavika.

2008/2009

Gassco

Skanled FEED for 3 subsea PLEM stations, 3 inline valve tee’s and two hot-tap tee’s, 6 onshore receiving/pigging stations, 3 landfall valve stations and metering facilities.

2008

Total

EPC of subsea pig launcher for Skirne Byggve Project

2008

Technip

Statfjord OLS-A spool Replacement. Detail engineering of rigid spool including fabrication.

2009-2010

Lyse

Detail design project of the gas pipeline branch at Risavika (2 km) and branch connection to RGC. Included landfall manifolds, filter and pigging facilities. EPCI of 6” concept gas pipeline to Skangass LNG plant, manifolds, filter and pigging facilities. Also EPCI of 4” concept gas line to RGC test facilities including pigging facilities.

2007/2008

SF Gass

Sløvåg 8” branch line. Detail engineering of 8” branch pipeline from inline tee at EVM to Sløvåg landfall. Detail design of vertical tie-in to 12” EVM pipeline, PLET and landfall station facilities including metering.

2007

Technip

Norne anchor replacement. EPC of temporary ROV deck. Marine operations analysis for replacement of Norne anchors.

2007

Statoil

Vigdis WI pipeline project: Design of tie-in structure, spools and transition piece.

2006/2007

Technip

Statoil IMR: Support of engineering services related to Tampen Link hot-tap operation

2006

BP

Valhall Flank, Detail design of PLEM and Tee design

2005

Statoil

Sleipner / Draupner Conceptual PLEM/Hot Tap design

2005

Statoil

Tampen Link, Detail design of 2 Tee’s in PLEM
























Subsea Cable and Umbilicals References

Year

Client

Description

2012

Statoil

Utsira High Power Hub – Cable Route Verification Study

2012

EMAS

Troll A Power Cable detail Design

2011-

Aker/Total

Martin Linge SURF CONCEPT Engineering.

1) CONCEPT Engineering of a 162 km AC power cable from Kollsnes to Martin Linge platform, a world record length. The work included: routing and crossings, landfall/civil eng., installation and protection, J-tube pull-in, seabed intervention design, alignment sheets etc.

2) CONCEPT Engineering of a 55 km fibre optic cable from Huldra to Martin Linge platform

2011

Statoil

Snorre and Grane PRM CONCEPT study. CONCEPT level engineering for the engineering of the permanent reservoir monitoring system planned for the Snorre and Grane fields, totalling ca. 480 km of seismic cable grid.

2011

Statoil

Valemon Fibre Optic and Power Cable Detail Design. Detail design of a FOPC from the Kvitebjørn jacket to the planned Valemon jacket. Part of the overall detail pipeline engineering package.

2010-11

Statoil

Troll A cables Concept Study. Statoil is planning to install 5 new cables to Troll A platform. IKM performed conceptual engineering for both Mongstad and Kollsnes as source locations. Routing, survey definition, free span, crossings, installation, seabed intervention, alignment sheets etc.

2010

ConocoPhillips

Ekofisk 2/4 VB Detail Design. As part of the pipeline engineering, the scope included detail design for a new umbilical between template 2/4B and 2/4A. Work included: routing, crossings, installation, tie-in, subsidence analysis, protection design, alignment sheets etc.

2009-11

Technip/DONG

Oselvar project. 3rd Party verification and certification of the umbilical between

IKM Ocean Design -f ooter
IKM Ocean Design -f ooter
IKM Ocean Design -f ooter
IKM Ocean Design AS
Vassbotnen 1, 4313 Sandnes, Norway, T: +47 51 21 21 00,  F: +47 51 21 21 01,  E:  IKModesi@IKM.no