Dimensions

  • Length(mm):
    4800
  • Width(mm):
    2438
  • Height(mm):
    2895
  • Transport weight (kg):
    8750
  • Lifting/ Transportation:
    Container with forklift channels and lifting slings. DNV 2.7-1:2013

Area of use / certification

  • Onshore/offshore:

    Offshore

  • Standard:
    Rigsafe for back deck operations
  • Over Pressure (Yes/No):

    Yes

Type

  • Item type:
    IRM Container 1.0
  • Container Type:

    Pigging container

    Test-/ Instrument container

Content

  • Content:

    TECHNICAL SPECFICATIONS:

    • 1000 barg pressure rated components

    • Rigsafe for back deck operations

    • Certified in accordance with DNV 2.7-1:2013

    • Auxiliary pressure testing point

    • HMI touch screen controls – Pressure and flowrate controlled internally

    • Digital instrumentation

    • Internal flowmeter

    • Self-deploying hose reel c/w 240m ¾” HP downline and lineout meter

    PUMP SPECFICATIONS:

    • Pump 1 (Electric) : 520 barg / 0 - 21 litres/min

    • Pump 2 (Electric) : 40 barg / 0 - 100 litres/min

    • Pump 3 (Air driven) : 917 barg / 0 - 16.3 litres/min

    • Pump 4 (Air driven) : 1634 barg / 0 - 9.1 litres/min

Connections

  • Inlet connection:
    Maximum Air Requirements : 7 barg - 450 scfm

Power supply

  • Fuse (A):
    63
  • El.Power1:
    440 V
  • (Hz):
    50/60

Additional information

  • Equipment / Functions:

    IKM’s self-contained innovative IRM container challenges the way industry carries out subsea pipeline pre-commissioning and IRM work, providing a decrease in both vessel mob/demob and operational time.

    Benefits:

    • Bespoke design for pre-commissioning / IRM work

    • Reduced mobilisation / demobilisation time

    • Reduction in required deck space

    • Fewer hose runs on deck

    • Reduced vessel schedules as hose deployment / recovery time is faster

    • When combined with IKM’s hydraulic hose chute systems, hose deployment and recovery operations can be completed without any vessel assistance, freeing up deck crew to perform other activities

    • Improved safety during high-pressure testing operations as personnel situated away from line-of-fire of all HP pipework