PP-119A
PUMP FOR PIGGING / CHEMICAL CLEANING
PUMP FOR PIGGING / CHEMICAL CLEANING
Offshore
Diesel
MUST BE CONNECTED TO SEPERATE PUMP UNIT (PP-119B), (see separate datasheets for technical information)
- Diesel tank is located at pump unit, Diesel level must be limited to 600 liters for offshore use.
- Signal to platform if : Fire and gas alarm
- Novec 1230 Fire extinguishing system
- Fire extinguisher 12kg.
- Unit is certified by Notified Body (DNV) to run without flame traps in the exhaust in hazardous area (Zone 2).
- Two-piece unit, where the engine and pump has to be connected via a drive shaft, hydraulic and diesel hoses.
MOTOR SHUT DOWN IF:
- To high r.p.m on motor.
- High exhaust temperature.
- Emergency stop from control room
- High coolant temperature.
- Emergency stop.
- Low level coolant
- Fire alarm
- Low oil pressure.
- 10% Lel Gas alarm.