
SCCO2 Study
Reactivation of Downhole Chemical Injection Control Line in 12 hours
Reactivation of Downhole Chemical Injection Control Line in 12 hours
Using Add On Gate Valve Tool
-by Requesting Turbulent Flow
Industry to recover Returns on Investments
-and Back-Flushing, Using the SCCO2 Technology
Back-Flushing Line with the SCCO2 Technology UKCS
On-shore, using the SCCO2 Technology
- Sub-Sea, Using the SCCO2 Technology